Clemson Memorial Stadium
General Contractor:
Brasfield & Gorrie
Scope of Work:
Our team is proud to have been a part of the Clemson Memorial Stadium renovations. With the project divided into multiple stages, Phase I focused on the Masters Club located in the West End Zone. The exterior components included cold formed exterior framing, sheathing, spray insulation at the roof line, and EIFS/Stucco. The interior is metal framed with Sound Batt insulation. The drywall was completed with standard finishing and Level 5 finishing in the entry way. The Masters Club ceilings included acoustical clouds and Armstrong Axiom Indirect Light Coves. The suites feature FRP panels and soffits. Other aspects of this project included shaftwalls and door frame installation.
Phase II included the team store, tunnel, and locker room. The walls and ceilings of these spaces were metal framed. Sound Batt insulation, drywall, FRP panels, and finishing were used to complete the space, along with Level 5 finishing in select areas. The locker room features radius walls and a unique radiused, sloping football shaped ceiling in the center.
It was a pleasure to work with Brasfield & Gorrie on this project.