Clemson Memorial Stadium

General Contractor:
Brasfield & Gorrie

Scope of Work:

Our team is proud to have been a part of the Clemson Memorial Stadium renovations. With the project divided into multiple stages, Phase I focused on the Masters Club located in the West End Zone. The exterior components included cold formed exterior framing, sheathing, spray insulation at the roof line, and EIFS/Stucco. The interior is metal framed with Sound Batt insulation. The drywall was completed with standard finishing and Level 5 finishing in the entry way. The Masters Club ceilings included acoustical clouds and Armstrong Axiom Indirect Light Coves. The suites feature FRP panels and soffits. Other aspects of this project included shaftwalls and door frame installation.

Phase II included the team store, tunnel, and locker room. The walls and ceilings of these spaces were metal framed. Sound Batt insulation, drywall, FRP panels, and finishing were used to complete the space, along with Level 5 finishing in select areas. The locker room features radius walls and a unique radiused, sloping football shaped ceiling in the center.

It was a pleasure to work with Brasfield & Gorrie on this project.

Privacy Settings
We use cookies to enhance your experience while using our website. If you are using our Services via a browser you can restrict, block or remove cookies through your web browser settings. We also use content and scripts from third parties that may use tracking technologies. You can selectively provide your consent below to allow such third party embeds. For complete information about the cookies we use, data we collect and how we process them, please check our Privacy Policy
Youtube
Consent to display content from - Youtube
Vimeo
Consent to display content from - Vimeo
Google Maps
Consent to display content from - Google